极速赛车两期计划

In April of 2010, Michie Corporation teamed with E. D. Swett, Inc. of Concord, NH to supply precast bridge deck units to be used in the reconstruction of NHDOT Bridge No. 163/106, carrying Interstate 93 (F. E. Everett Turnpike) over Loudon Road (NH Route 9) at exit 14 in Concord, NH. With timing an important element, as the heavily travelled southbound lanes of Interstate 93 would have to be closed, a new pre-assembly construction technique was employed at Michie Corporation’s Henniker, NH fabrication plant prior to actually shipping the individual units to the job site. All precast deck units were fully assembled – from the pouring of the concrete to the pre-drilling of attachment holes through the metal “I” beams under controlled conditions. Therefore, once on site, the deck units went together smoothly like a finely engineered jig saw puzzle. Once traffic was diverted off the bridge a complete superstructure replacement was constructed. The precast deck units were then easily assembled by the contractor in a strong, quickly assembled bridge surface requiring a shutdown of traffic for only 56 hours from start to finish. This bridge will provide both New Hampshire residents and visiting tourists with trouble-free travel for years to come.

Comments are closed.

秒速飞艇官方网站 极速飞艇号码 SG飞艇现场开奖结果 秒速飞艇网上投注 澳洲幸运10开奖记录网 秒速飞艇数据 澳洲幸运5官方开奖直播 澳洲8微信群 澳洲幸运5分析